Work in Progress: Design & Construction

Big things are happening on the Atlanta BeltLine! In addition to over seven miles of completed trail segments, there is active construction work on the BeltLine, and several segments are in various planning and design stages. Explore design and construction projects in progress.

Map View
List View
ConstructionDesign
Project Name Location Description Subarea
Northeast Trail – Segments 3, 4, 5, 6 (North)Buford Highway to MARTA Lindbergh StationThis project will design, bid out, and build 2.4-miles of mainline trail from Buford Highway to...6, 7
Westside Trail – 1385 Ralph David Abernathy Access PointWestside Trail near Ralph David Abernathy BlvdThe aim of this project is to provide an access point to the Westside Trail at Ralph David...1
Southside Trail – Segments 2, 3, 4, 5I-75 Underpass to Bill Kennedy WayThe project includes the design of a 14 foot wide concrete multi-use path and extending...2, 3
Northwest Corridor – Beltline Feasibility StudyCSX Freight Corridor – Huff to Armour Rail and NS from Howell Mill to Armour RailCompleting the Northwest BeltLine is a key objective for the Atlanta BelLine, and will close the...6, 7, 8, 9, 10
Eastside Trail – Capital Improvements ProjectMonroe to IrwinThe Atlanta BeltLine welcomes more than 2 million users a year, many of which frequent the...5, 6
Eastside – Ponce Streetscape ProjectPonce De Leon Avenue from Boulevard to Freedom ParkwayThe streetscaping of State Road 8 (Ponce De Leon Avenue) will extend from Boulevard/Monroe Drive...6
Southside Trail – Brownfield RemediationTerminus of SST-W at Pittsburgh Yards to Boulevard SE (Possibly extending to Glenwood)ABI was awarded a $500,000 Brownfield Cleanup Grant from the Environmental Protection Agency...2
Southside – Bill Kennedy Way Interim Trail + StreetscapeBill Kennedy Way through Glenwood Park to Glenwood AveThis project includes improvements to the existing Bill Kennedy Way (BKW) bridge over I-20 and...4, 5
Northeast Trail – Segment 1 (Piedmont Park)Piedmont Park (Monroe Drive to Westminster Drive)Alternatives analysis and concept validation is underway as part of federally funded trail...6
Westside – Enota ParkEnota Park located adjacent to the Westside Trail in the Westview neighborhoodEnota Park is a +/- 8-acre park comprised of three parcels – identified as the Upper, Middle,...1
Southside – Boulevard Crossing Park+/- 25-acre park located at the intersection of Boulevard and Englewood SEThis is Phase II of the design of Boulevard Crossing Park. The first phase of the park, which...3
Westside Trail – Segment 3 (Marietta Blvd)Westside Trail Segment 3 is mainline BeltLine trailWestside Segment 3 is mainline BeltLine trail and will run 1.22 miles from Law Street to Huff...10
Southside Trail – Segment 1 (West Segment)Terminus of Westside Trail at Allene Ave to Pittsburgh YardsSouthside Trail - Segment 1, also called Southside Trail West, is the first of five segments of...2
Southside Trail – Utility CoordinationTerminus of SST-W to GlenwoodFor the Southside Trail Segments 2, 3, 4, and 5, ABI will begin the process of coordinating any...2, 3
Northeast Trail – Segment 2 (Central / Hairpin)Clear Creek to Buford Highway; Subarea 6Segment 2, Phase  I work is now complete and the paved trail is 6
Westside Trail – Segment 4 (North Extension)Lena Street (existing Westside Trail terminus) to Wheeler Street (tying into the BeltLine Connector Trail); Subareas 9 and 10The northern extension of the Westside Trail, also called Westside Segment 4, begins at the...9, 10
Westside – Ralph David Abernathy – Streetscape800’ length of streetscape and parking protected bike lanes10