Big things are happening on the Atlanta BeltLine! In addition to over seven miles of completed trail segments, there is active construction work on the BeltLine, and several segments are in various planning and design stages. Explore design and construction projects in progress.
Map View
Northeast – Unpaved Trail Gravel Refresh
This project is complete and installed a new, six-inch layer of gravel, approximately fourteen feet Read More →
List View
Project Name | Location | Description | Subarea |
---|---|---|---|
Northeast Trail (North)- Segment 3 and Connector Trails | Buford Highway to MARTA Lindbergh Station | This project will design, bid out, and build 2.4-miles of mainline trail from Buford Highway to... | 6, 7 |
Westside Trail – 1385 Ralph David Abernathy Access Point | Westside Trail near Ralph David Abernathy Blvd | The aim of this project is to provide an access point to the Westside Trail at Ralph David... | 1 |
Southside Trail – Segments 2, 3, 4, 5 | I-75 Underpass to Bill Kennedy Way | The project includes the design of a 14 foot wide concrete multi-use path and extending... | 2, 3 |
Northwest Corridor – BeltLine Trail Alignment Study | CSX Freight Corridor – Huff to Armour Rail and NS from Howell Mill to Armour Rail | The Northwest Trail is a critical quadrant of the Atlanta BeltLine loop connecting from the area... | 6, 7, 8, 9, 10 |
Eastside Trail – Capital Improvements Project | Monroe Drive to Irwin Street | The Atlanta BeltLine welcomes more than 2 million users a year, many of whom frequent the... | 5, 6 |
Eastside – Ponce Streetscape Project | Ponce De Leon Avenue from Boulevard to Freedom Parkway | The streetscaping of Ponce De Leon Avenue (State Road 8) will extend from Boulevard/Monroe Drive... | 6 |
Southside Trail – Brownfield Remediation | Terminus of SST-W at Pittsburgh Yards to Boulevard SE (Possibly extending to Glenwood) | ABI was awarded a $500,000 Brownfield Cleanup Grant from the Environmental Protection Agency... | 2 |
Southside – Bill Kennedy Way Unpaved Trail + Streetscape | Bill Kennedy Way through Glenwood Park to Glenwood Ave | This project project is now complete. It included improvements to the existing Bill Kennedy Way... | 4, 5 |
Northeast Trail – Segment 1 (Piedmont Park) | Piedmont Park (Monroe Drive to Westminster Drive) | The Northeast Trail - Segment 1 runs 0.9 miles alongside Piedmont Park from Monroe Drive to... | 6 |
Westside – Enota Park | Enota Park located adjacent to the Westside Trail in the Westview neighborhood | Enota Park is a +/- 8-acre park comprised of three parcels – identified as the Upper, Middle,... | 1 |
Southside – Boulevard Crossing Park | +/- 25-acre park located at the intersection of Boulevard and Englewood SE | This is Phase II of the design of Boulevard Crossing Park. The first phase of the park, which... | 3 |
Westside Trail – Segment 3 (Marietta Blvd) | Westside Trail Segment 3 is mainline BeltLine trail | Westside Segment 3 is mainline BeltLine trail and will run 1.22 miles from Law Street to Huff... | 10 |
Southside Trail – Segment 1 (West Segment) | Terminus of Westside Trail at Allene Ave to Pittsburgh Yards | Southside Trail - Segment 1 is the first of five segments of the Southside Trail to be completed... | 2 |
Southside Trail – Utility Coordination | Terminus of SST-W to Glenwood | For the Southside Trail Segments 2, 3, 4, and 5, ABI will begin the process of coordinating any... | 2, 3 |
Northeast Trail – Segment 2 (Central / Hairpin) | Clear Creek to Buford Highway | The Northeast Trail - Segment 2 will ultimately be 1.2 miles in length and run from Westminster... | 6 |
Westside Trail – Segment 4 (North Extension) | Lena Street (existing Westside Trail terminus) to Law Street (tying into the BeltLine Connector Trail); Subareas 9 and 10 | The northern extension of the Westside Trail, also called Westside Trail - Segment 4, begins at... | 9, 10 |
Northeast – Unpaved Trail Gravel Refresh | Piedmont Park | This project is complete and installed a new, six-inch layer of gravel, approximately fourteen... | 6 |
Westside – Ralph David Abernathy – Streetscape | Ralph David Abernathy Blvd | The Ralph David Abernathy Blvd Streetscape project runs between Willard Avenue and East Ontario... | 10 |