Skip to content

Design

Southside Trail– Segment 6, Phase II

Southside Trail - Segment 6 runs along Bill Kennedy Way between Glenwood Avenue and Memorial Drive. This project will replace the interim condition and create a new pedestrian bridge over I-20. The section running through Glenwood Park will also be improved.

Southside Trail - Segment 6 temporary condition with cyclist. Photo by Erin Sintos.

A new pedestrian bridge will be constructed alongside the existing bridge over I-20 on Southside Trail - Segment 6. (Photo by JandD Images)

Project Status

The design of this project kicked off with the community during an ABI Study Group meeting in March 2024. The engineering team is currently developing typical cross sections and options for the street and trail composition and alignment. A Study Group meeting will be scheduled this summer, when the concepts are ready to present. The project will be completed in two phases: Phase 1 will include work in the ATDOT right of way which is expected to start in summer of 2025, followed by work in the GDOT right of way in summer of 2026.

Project Timeline

  • March 2024: Design Kickoff

  • Summer 2024: Design Concepts to be presented at ABI Study Group meeting

  • Summer 2025: ATDOT work to begin

  • Summer 2026: GDOT work to begin

The Atlanta Beltline through the Glenwood Park neighborhood. Photo by JandD Images.

Design & Construction Team

Questions?

Project Managers
Shaun Green
Meghan Injaychock