Construction
Southside Trail – Hank Aaron Access Point
This access point will connect Segment 2 of the Southside Trail to the Hank Aaron Drive sidewalk, aligning with the signalized crosswalk serving the MARTA Summerhill BRT. This project began as a collaboration between the Beltline, the developer, and MARTA. Design was completed in November, and construction will occur after FIFA World Cup 26™.

Project Status
Full design and permitting in progress. The project will be completed after FIFA 2026.