Skip to content

Southside Trail-Segment 1 Ribbon Cutting Ceremony Announced

Atlanta Beltline, Inc. and the Atlanta Beltline Partnership are thrilled to announce the ribbon cutting ceremony for the first segment of the Southside Trail! Set to take place on Tuesday,...

  • Parks & Trails
SEPTEMBER 17, 2021

Southside Trail ribbon cutting announcement

Atlanta Beltline, Inc. and the Atlanta Beltline Partnership are thrilled to announce the ribbon cutting ceremony for the first segment of the Southside Trail! Set to take place on Tuesday, October 12, 2021 at 9:30 a.m., the event will feature remarks by Mayor Keisha Lance Bottoms and other honored guests along with a ceremonial cutting of the ribbon. It will take place at Pittsburgh Yards®, at 352 University Avenue, SW, Atlanta, 30310. Limited on-site parking is available and alternative modes of transportation are encouraged. The ceremony will also be offered virtually with a livestream on Zoom and live broadcast on the Atlanta Beltline’s facebook page. Zoom details are below.

All are welcome to join.  To ensure the safety of attendees, masks are strongly encouraged, and hand sanitizer will be available. There will be a limited number of spaced-out chairs in front of the covered stage, and standing guests are encouraged to socially distance as possible.

Southside Trail ribbon cutting ceremony virtual attendance information:

Please click the link below to join the Zoom webinar: https://us02web.zoom.us/j/83699242456?pwd=djBjaVkrZU5Uck15Y08ybXAycktDdz09
Passcode: 384096
Webinar ID: 836 9924 2456

Or One tap mobile :
US: +16465588656,,83699242456#,,,,*384096# or +13017158592,,83699242456#,,,,*384096#

Or Telephone:
Dial (for higher quality, dial a number based on your current location):
US: +1 646 558 8656 or +1 301 715 8592 or +1 312 626 6799 or +1 669 900 9128 or +1 253 215 8782 or +1 346 248 7799

International numbers available: https://us02web.zoom.us/u/kcWSpJh1K7 (https://us02web.zoom.us/u/kcWSpJh1K7)

  • Looking west from the eastern end of the Southside Trail with Pittsburgh Yards to the right. September 2, 2021.

    Looking west from the eastern end of the Southside Trail with Pittsburgh Yards to the right. September 2, 2021. Photo by John Becker.

    The current eastern end of the Southside Trail with the passage under Downtown Connector in the background. September 2, 2021.

    The current eastern end of the Southside Trail with the passage under Downtown Connector in the background. September 2, 2021. Photo by John Becker.

    Southside Trail looking east toward the Downtown Connector. September 2, 2021.

    Southside Trail looking east toward the Downtown Connector. September 2, 2021. Photo by John Becker.

    Connecting path from Manford Road to Pittsburgh Yards across the Southside Trail. September 2, 2021.

    Connecting path from Manford Road to Pittsburgh Yards across the Southside Trail. September 2, 2021. Photo by John Becker.

    Southside Trail connecting path to Manford Road. September 2, 2021.

    Southside Trail connecting path to Manford Road. September 2, 2021. Photo by John Becker.

    Southside Trail looking east. September 2, 2021.

    Southside Trail looking east. September 2, 2021. Photo by John Becker.

    Southside Trail over Metropolitan Parkway. September 2, 2021.

    Southside Trail over Metropolitan Parkway. September 2, 2021. Photo by John Becker.

    Ramp between the Southside Trail and Metropolitan Parkway. September 2, 2021.

    Ramp between the Southside Trail and Metropolitan Parkway. September 2, 2021. Photo by John Becker.

    Southside Trail bridge over Metropolitan Parkway. September 2, 2021.

    Southside Trail bridge over Metropolitan Parkway. September 2, 2021. Photo by John Becker.

    Southside Trail looking west from the bridge over Metropolitan Parkway. September 2, 2021.

    Southside Trail looking west from the bridge over Metropolitan Parkway. September 2, 2021. Photo by John Becker.

    Southside Trail where a path branches off to Allene Avenue. "The Vivian" development by RangeWater will be to the left. September 2, 2021.

    Southside Trail where a path branches off to Allene Avenue. “The Vivian” development by RangeWater will be to the left. September 2, 2021. Photo by John Becker.

    Retention pond between the Southside Trail and the connecting path to Allene Avenue. September 2, 2021.

    Retention pond between the Southside Trail and the connecting path to Allene Avenue. September 2, 2021. Photo by John Becker.

SHARE:

Subscribe to In The Loop, our monthly newsletter, for Beltline news, events, announcements and more.

Subscribe